Outdoor PLAYbook Logo
  • Learn
    • Landscape Architecture & Going Green
      • Industry Trends and Sustainability
      • Plants and Play
      • Materials
      • What is a Landscape Architect?
      • Design Basics
      • Designing Play Environments
      • Designing Outdoor Classrooms
      • Designing for Accessibility
      • Designing School Gardens
      • Active Transportation
    • Play Research & Child Development
      • Injury Prevention Research
      • Nature-based Landscapes for Play
      • A History of Play
      • The 7 Cs
        • Character
        • Context
        • Connectivity
        • Change
        • Chance
        • Clarity
        • Challenge
    • Education Research
      • Outdoor Classrooms
      • Overcoming Barriers
      • Curriculum Connections
      • Environmental, Embodied, Experiential Learning
      • History of Outdoor Learning
    • Inspirational Projects
    • Key Terms
    • Recommended Reading & Resources
  • Play Elements
    • Play Elements by Grade
    • Play Elements by Type
    • Play Elements by Activity
  • Plan
    • Phase 1: What parents can do on their own
      • Talk to Your Principal & School Board Approval Process
      • Form Your Team
      • Set Your Goals / Define Your Constraints
      • Fundraising
      • Get Inspired
      • Know Your School
        • The Site
        • The Community
      • Design Brainstorm
      • Product: Design Scope Document
    • Phase 2: Working with a design professional
      • Working with Design Professionals
      • Create a Plan
      • Phasing and the Future
        • Phasing
        • Long-Term Maintenance
      • Costing
      • Design Development
      • Final School Board Approval Process
      • Product: Final Drawing Set for Construction
  • Build
    • Time to Build!
    • The Construction Process
      • Getting Ready to Build
      • Demo and Recycling
      • Grading and Underground Systems
      • Constructing Walls and Structures
      • Paving and Ground Surfaces
      • Plants, Turf, and Irrigation
      • Site Furnishings, Equipment & Lighting
      • Ribbon Cutting Ceremony
      • Post Construction Warranty Period
    • Maintenance
      • Paving and Ground Surfaces
      • Structures
      • Turf and Trees
      • Rain Gardens and Green Elements
      • School Gardens
      • Shrubs & Hedges
  • Your District
    • Marketplace
    • School Districts by Province
      • Alberta
      • British Columbia
      • Manitoba
      • New Brunswick
      • Newfoundland
      • Northwest Territories
      • Nova Scotia
      • Nunavut
      • Ontario
      • Prince Edward Island
      • Quebec
      • Saskatchewan
      • Yukon
  • About Us
    • Meet the Team
    • Contact
    • Feedback

Home » Play Elements » Play Elements by Activity

Slide

Who doesn't love sliding? A timeless playground staple that provides a speedy, exhilarating trip downhill that can be enjoyed again and again.

← All Activities
Metal can be used to construct play mounds, and can be finished in a number of different ways. If a plain metal finish is desired, it is best to place...

Metal Mounds

An important part of any play environment, slides can be used to navigate grade changes by being built into hillsides, or incorporated into play...

Slides

Climbing structures can be simple or elaborate, inexpensive to pricey, and anything in between! You can pick a piece of equipment out of a catalogue...

Climbing Structures

 
Just like the name implies, these slides are built right into hills. The advantage of a hill slide is that no ladders are required to get to the top....

Hill Slides

  • About Us
  • Learn
  • Play Elements
  • Plan
  • Build
  • Your District
  • Contact
Copyright © 2015-2025 Outdoor PLAYbook — All rights reserved